WELSH STATUTORY INSTRUMENTS
2016 No. 55 (W. 25)
Town and country planning, wales
The Developments of National Significance (Procedure) (Wales) Order 2016
EXPLANATORY NOTE
(This note is not part of the Order)
Development in Wales is of national significance if it meets criteria specified in regulations([1]) or is specified as such in the National Development Framework([2]).
This Order makes provision for the manner in which applications for planning permission in respect of such development are to be dealt with by the Welsh Ministers.
This Order includes provision in relation to—
- Notification of proposed development and the acceptance of such notification by the Welsh Ministers (articles 5 and 6);
- Pre-application publicity and consultation (articles 7 to 11);
- General requirements applicable to the making of an application (article 12);
- Acceptance of applications by the Welsh Ministers (article 15);
- Requirements applicable to the giving of notice before an application is made (article 16);
- Publicity requirements applicable following the making of an application (articles 18 and 19);
- Requirements related to the register of applications maintained by local planning authorities (article 20);
- Local impact reports (articles 25 and 26);
- Variation of applications (article 27);
- Notice to be given by the Welsh Ministers in respect of their decision on applications and the revision of such notices (articles 29 and 30);
- Requirements related to notification of initiation of development and display of notices (article 31).
An impact assessment has been prepared in relation to this Order. Copies are available from the Planning Division of the Welsh Government, Cathays Park, Cardiff, CF10 3NQ and on the Welsh Government’s website at www.wales.gov.uk.
WELSH STATUTORY INSTRUMENTS
2016 No. 55 (W. 25)
town and country planning, wales
The Developments of National Significance (Procedure) (Wales) Order 2016
Made 27 January 2016
Laid before the National Assembly
for Wales 2 February 2016
Coming into force in accordance with article1
CONTENTS
PART 1
Preliminary
1. Title, commencement and application
2. Interpretation
3. Electronic communications
4. Representation period
PART 2
Pre-application
5. Notification of proposed development
6. Acceptance of notification of proposed development
7. Requirement to carry out pre-application consultation
8. Publicity before applying for planning permission
9. Consultation before applying for planning permission
10. Duty to respond to pre-application consultation: specialist consultees
11. Pre-application consultation reports
PART 3
Applications
12. Applications: general requirements
13. Applications in respect of Crown land
14. Design and access statements
15. Acceptance of applications
16. Notices of applications for planning permission
17. Certificates in relation to notices of application
18. Publicity for applications for planning permission: Welsh Ministers
19. Publicity for applications for planning permission: local planning authority
20. Register of applications
21. Representations received by the local planning authority in respect of applications
PART 4
Consultations before the grant of permission
22. Duty to consult before the grant of permission
23. Duty to respond to consultation
24. Duty to respond to consultation: annual reports
PART 5
Reports
25. Local impact reports
26. Voluntary local impact reports
PART 6
Variation of applications
27. Procedure in respect of variation of applications
PART 7
Determination and notification of initiation of development
28. Representations to be taken into account
29. Written notice of decision relating to an application
30. Revised notice of decision to grant planning permission
31. Notification of initiation of development and display of notice
PART 8
Amendment to 2012 Order
32. Amendment to the 2012 Order
SCHEDULE 1 — Publicity and consultation before applying for planning permission
SCHEDULE 2 — Consultation before applying for planning permission
SCHEDULE 3 — Notices under Article 16
SCHEDULE 4 — Publicity for applications
SCHEDULE 5 — Duty to consult before the grant of permission
SCHEDULE 6 — Notification of initiation of development and display of notice
SCHEDULE 7 — Notice to be displayed at all times when development is being carried out
The Welsh Ministers, in exercise of the powers conferred on the Secretary of State by sections 59 and 61 of the Town and Country Planning Act 1990([3]) and now exercisable by them([4]), in exercise of the powers conferred on the Secretary of State by sections 62, 65, 69 and 71 of that Act([5]) now exercisable by them (as applied with modifications by the Developments of National Significance (Application of Enactments) (Wales) Order 2016)([6]), in exercise of the powers conferred on them by sections 61Z, 62E, 62I, 62J, 62K, 62L, 62R, 71ZA, 71ZB and 333 of that Act([7]) and in exercise of the powers conferred on the National Assembly for Wales by section 54 of the Planning and Compulsory Purchase Act 2004([8]) and now exercisable by them([9]), make the following Order:
PART 1
Preliminary
Title, commencement and application
1.—(1) The title of this Order is the Developments of National Significance (Procedure) (Wales) Order 2016 and it comes into force immediately after the Application of Enactments Order comes into force.
(2) This Order applies where—
(a) an application is made to the Welsh Ministers under section 62D of the 1990 Act (developments of national significance: applications to be made to the Welsh Ministers)([10]); or
(b) such an application is proposed to be made.
(3) Where the land is the subject of a special development order, whether made before or after the commencement of this Order, this Order will apply to that land only to such extent and subject to such modifications as may be specified in the special development order([11]).
Interpretation
“the 1990 Act” (“Deddf 1990”) means the Town and Country Planning Act 1990;
“the 2004 Act” (“Deddf 2004”) means the Planning and Compulsory Purchase Act 2004;
“the 2012 Order” (“Gorchymyn 2012”) means the Town and Country Planning (Development Management Procedure) (Wales) Order 2012([12]);
“the EIA Regulations” (“y Rheoliadau AEA”) means the Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016([13])
“the Application of Enactments Order” (“y Gorchymyn Cymhwyso Deddfau”) means the Developments of National Significance (Application of Enactments) (Wales) Order 2016([14]);
“address” (“cyfeiriad”) has the meaning given in article 3(1)(a);
“applicant” (“ceisydd”) means a person who either proposes to make an application or has made such an application;
“building” (“adeilad”) includes any structure or erection, and any part of a building, as defined in this article, but does not include plant or machinery or any structure in the nature of plant or machinery;
“community consultee” (“ymgynghorai cymunedol”) means—
(a) each county or county borough councillor representing an electoral ward in which the land to which the proposed application relates is situated; and
(b) each community council in whose area the land to which the proposed application relates is situated;
“design and access statement” (“datganiad dylunio a mynediad”) has the meaning given in article 14(1);
“electronic communication” (“cyfathrebiad electronig”)has the meaning given in section 15(1) of the Electronic Communications Act 2000 (general interpretation)([15]);
“electoral ward” (“ward etholiadol”) means any area for which a councillor is elected to a county council or a county borough council in Wales;
“environmental statement” (“datganiad amgylcheddol”) has the meaning given in regulation 2(1) of the EIA Regulations;
“erection” (“codi”), in relation to buildings as defined in this article, includes extension, alteration or re-erection;
“local planning authority” (“awdurdod cynllunio lleol”), except in the case of articles 25 and 26, means the local planning authority to which, but for section 62D of the 1990 Act, the application would be made;
“mining operations” (“gweithrediadau mwyngloddio”) means the winning and working of minerals in, on or under land, whether by surface or underground working;
“notification of proposed development” (“hysbysiad o ddatblygiad arfaethedig”) has the meaning given in article 5(2);
“representation period” (“cyfnod sylwadau”) has the meaning given in article 4;
“screening direction” (“cyfarwyddyd sgrinio”) has the same meaning given in regulation 2(1) of the EIA Regulations;
“by site display” (“drwy arddangos ar y safle”) means by the posting of the notice by firm affixture to some object, sited and displayed in such a way as to be easily visible and legible by members of the public;
“specialist consultee” (“ymgynghorai arbenigol”) means, in circumstances where the development([16]) to which the application or proposed application relates falls within a category set out in the Table in Schedule 5, the authority, person or body mentioned in relation to that category; and
“working day” (“diwrnod gwaith”) means a day which is not a Saturday, Sunday, Bank Holiday or other public holiday in Wales.
Electronic communications
3.—(1) In this Order, and in relation to the use of electronic communications for any purpose of this Order which is capable of being effected electronically—
(b) references to notices, representations or other documents, or to copies of such documents, include references to such documents or copies of them in electronic form.
(2) Paragraphs (3) to (7) apply where an electronic communication is used by a person for the purpose of fulfilling any requirement in this Order to give or send any statement, notice or other document to any other person (“the recipient”).
(a) capable of being accessed by the recipient;
(b) legible in all material respects; and
(c) sufficiently permanent to be used for subsequent reference.
(4) In paragraph (3), “legible in all material respects” (“darllenadwy ym mhob modd perthnasol”) means that the information contained in the notice or other document is available to the recipient to no lesser extent than it would be if sent or given by means of a document in printed form.
(5) Where the electronic communication is received by the recipient outside the recipient’s business hours, it will be taken to have been received on the next working day.
(6) A requirement in this Order that any document should be in writing is fulfilled where that document meets the criteria in paragraph (3), and “written” (“ysgrifenedig”) and cognate expressions are to be construed accordingly.
(7) Except where a hard copy is expressly required, a requirement in this Order to send more than one copy of a statement or other document is complied with by sending one copy only of the statement or other document in question in electronic form.
Representation period
4.—(1) Subject to paragraph (2), the “representation period” (“cyfnod sylwadau”) is the period of 5 weeks beginning with the day on which the Welsh Ministers give notice in accordance with article 15(2) that they accept an application.
PART 2
Pre-application
Notification of proposed development
5.—(1) An applicant must notify the Welsh Ministers and local planning authority of a proposed application in accordance with the following provisions of this article.
(2) The notification (“notification of proposed development”) (“hysbysiad o ddatblygiad arfaethedig”) must consist of—
(a) the form published for this purpose by the Welsh Ministers (or a form substantially to the like effect), including the particulars specified or referred to in the form;
(b) a plan which identifies the land to which the application relates; and
(c) either—
(i) a statement confirming that an environmental statement will be provided; or
Acceptance of notification of proposed development
6.—(1) Where an applicant notifies the Welsh Ministers of a proposed application in accordance with article 5, the Welsh Ministers must give notice to the applicant and local planning authority of their acceptance of that notification in accordance with the following provisions of this article.
(4) Where the Welsh Ministers consider that they have received notification of proposed development which is not in accordance with article 5, they must within 10 working days, beginning with the day of receipt of the notification by the Welsh Ministers (or such longer period as the Welsh Ministers may in any particular case determine) inform the following in writing that such notification is not accepted —
(a) the applicant;
(b) the local planning authority; and
(c) any other persons that the Welsh Ministers consider appropriate.
Requirement to carry out pre-application consultation
7. Development of national significance([17]) is specified for the purposes of section 61Z of the 1990 Act (Wales: requirement to carry out pre-application consultation).
Publicity before applying for planning permission
8.—(1) The applicant must publicise the proposed application by—
(b) publishing the following information on a website maintained by the applicant, for not less than 42 days beginning with each day on which each of the notices referred to in subparagraph (a) or article 9(2) are given—
(i) the draft application form published by the Welsh Ministers under article 12(1)(a) (or a form substantially to the like effect), including the particulars specified in or referred to in the form;
(ii) a plan which identifies the land to which the proposed application relates;
(iv) a copy of the notice required by article 6 which has not lapsed under paragraph (3) of that article;
(v) the design and access statement required by article 14;
(vi) subject to article 12(3), the particulars or evidence required by the Welsh Ministers under section 62(3) of the 1990 Act (applications for planning permission)([18]);
(vii) where applicable, a statement referred to as the environmental statement for the proposed development; and
(viii) a written statement about any secondary consent([19]) connected with the proposed application([20]) in respect of which the applicant considers a decision on that consent is to be made or should be made by the Welsh Ministers, together with the draft application form and documents associated with such consents.
(2) The applicant must have complied with paragraph (1) before an application is submitted.
(3) Any plans or drawings required to be provided by paragraph (1)(b)(ii) or (iii) must be drawn to a scale identified by the applicant and, in the case of plans, must show the direction of north.
(4) Where the notice referred to in paragraph (1)(a)(i) is, without any fault or intention of the applicant, removed, obscured or defaced before the period of 42 days has elapsed, the applicant will be treated as having complied with the requirements of the relevant paragraph if they have taken reasonable steps to protect the notice and, if need be, replace it.
(5) In this article, “requisite notice” (“hysbysiad gofynnol”) means notice in the appropriate form set out in Schedule 1 or in a form substantially to the like effect.
Consultation before applying for planning permission
9.—(1) The following persons or descriptions of persons are specified for the purposes of section 61Z(4) of the 1990 Act—
(a) any community consultee;
(b) any specialist consultee; and
(c) any relevant person([21]).
(2) Where an applicant is required to consult a community consultee or a relevant person, the applicant must give the community consultee or the relevant person requisite notice in writing of the proposed application.
(3) Where an applicant is required to consult a specialist consultee, the applicant must give the specialist consultee requisite notice in writing of the proposed application and enclose each of the documents referred to in article 8(1)(b) or provide a link to a website on which those documents can be found.
(4) The applicant must have complied with paragraphs (2) and (3) and have given the specialist consultee time to respond in accordance with article 10(1) before an application is submitted.
(5) In this article, “requisite notice” (“hysbysiad gofynnol”) means—
(a) in relation to a community consultee or a relevant person notice in the appropriate form set out in Schedule 1; and
(b) in relation to a specialist consultee notice in the appropriate form set out in Schedule 2,
or in a form substantially to the like effect.
Duty to respond to pre-application consultation: specialist consultees
10.—(1) A specialist consultee, consulted in accordance with the provisions of section 61Z(4) of the 1990 Act, must provide a substantive response within 42 days beginning with the day on which the notice referred to in article 9(3) is given or such other period as may be agreed in writing between the specialist consultee and the applicant.
(2) For the purposes of this article, a substantive response is one which—
(a) states that the specialist consultee has no comment to make;
(b) states that the specialist consultee has no objection to the proposed development and refers the applicant to current standing advice by the specialist consultee on the subject of the consultation;
(c) advises the applicant of any concerns identified in relation to the proposed development and how those concerns can be addressed; or
(d) advises the applicant that the specialist consultee has concerns and that it would object to an application for planning permission made in the same or substantially the same terms and sets out the reasons for those objections.
Pre-application consultation reports
11.—(1) Where an applicant submits an application to the Welsh Ministers in accordance with article 12, that application must be accompanied by a pre-application consultation report which gives particulars of—
(a) how the applicant complied with section 61Z of the 1990 Act;
(b) any response to the consultation received from persons consulted under section 61Z(3) or (4) of the 1990 Act; and
(c) the account taken of those responses.
(2) The pre-application consultation report must include—
(a) a copy of the notice referred to in article 8(1)(a)(i);
(b) a declaration that the notice referred to in article 8(1)(a)(i) was displayed in accordance with the requirements of that article;
(c) a list of the addresses of the persons who were given notice of the proposed application in accordance with article 8(1)(a)(ii) and a copy of the notice given to such persons;
(d) a copy of the publication referred to in article 8(1)(a)(iii);
(e) a declaration that the applicant has complied with the publication requirements in article 8(1)(b);
(f) copies of all notices given to community consultees, relevant persons and specialist consultees in accordance with articles 9(2) and 9(3);
(g) a summary of all issues raised by any person notified of the proposed application in accordance with section 61Z(3) of the 1990 Act and articles 8 and 9(2), including confirmation of whether the issues raised have been addressed and, if so, how; and
(h) copies of all responses received from specialist consultees with an explanation of the account taken of each response.
PART 3
Applications
Applications: general requirements
12.—(1) An application must consist of —
(b) except in the case of an application made pursuant to section 73 of the 1990 Act (determination of applications to develop land without compliance with conditions previously attached)([22])—
(i) a plan which identifies the land to which the application relates;
(iii) a copy of the notice required by article 6 which has not lapsed under paragraph (3) of that article;
(iv) a design and access statement in accordance with article 14;
(v) the certificate required by article 17;
(vi) the pre-application consultation report required by article 11;
(viii) where applicable, an environmental statement;
(ix) a written statement about secondary consents connected with the proposed application in respect of which the applicant considers a decision is to be made or should be made by the Welsh Ministers; and
(x) a written statement about the status of discussions between the applicant and the local planning authority in respect of obligations under section 106 of the 1990 Act (planning obligations)([23]).
(2) Any plans or drawings required to be provided by paragraph (1)(b)(i) or (1)(b)(ii) must be drawn to a scale identified by the applicant and, in the case of plans, must show the direction of north.
(3) Paragraph (1)(b)(vii) only applies if—
(a) before the application is made the Welsh Ministers publish a list of requirements on their website; and
(b) the particulars or evidence that the Welsh Ministers require to be included in the application fall within that list.
(4) An application for development which includes mining operations or the use of land for mineral-working deposits([24]) must consist of—
(a) the application form published by the Welsh Ministers (or a form substantially to the like effect), including the particulars specified or referred to in the form; and
(a) the Welsh Ministers; and
(b) the local planning authority.
(6) The applicant must, as soon as reasonably practicable, confirm their compliance with the requirement in paragraph (5)(b) to the Welsh Ministers in writing.
(8) An application must be accompanied by any fee payable in respect of—
(a) the initial administration of the application; and
(b) any local impact report required under section 62I(2) of the 1990 Act.
Applications in respect of Crown land
13. An application in respect of Crown land must be accompanied by—
(a) a statement that the application is made in respect of Crown land; and
(b) where the application is made by a person authorised in writing by the appropriate authority, a copy of that authorisation.
Design and access statements
14.—(1) An application must include a statement (“a design and access statement”) (“datganiad dylunio a mynediad”) which complies with paragraph (2).
(2) A design and access statement must—
(a) explain the design principles and concepts that have been applied to the development;
(b) demonstrate the steps taken to appraise the context of the development and how the design of the development takes that context into account;
(c) explain the policy or approach adopted as to access, and how policies relating to access in the development plan([25]) have been taken into account; and
(d) explain how any specific issues which might affect access to the development have been addressed.
Acceptance of applications
15.—(1) The Welsh Ministers are to be taken as having received a “valid application” when they are in receipt of each of the following—
(a) an application which is in accordance with article 12(1);
(b) any fee required to be paid in respect of pre-application services provided under the Developments of National Significance (Wales) Regulations 2016([26]);
(c) the fee referred to in article 5(3); and
(d) the fees referred to in article 12(8).
(2) Where the Welsh Ministers receive a valid application, they must give notice of their acceptance of the application (“notice of acceptance”) (“hysbysiad derbyn”) to the applicant and the local planning authority in accordance with paragraph (4).
(3) It is the giving of such notice in accordance with paragraph (2) that constitutes acceptance of the application for the purposes of section 62L(3) of the 1990 Act (timetable for determining applications) (and the date the notice is given constitutes the date of acceptance).
(a) must be given in writing within the relevant period;
(b) must confirm that the application is accepted; and
(c) may include such other information related to the application as the Welsh Ministers consider appropriate.
(5) Where the Welsh Ministers consider that an application they have received is not a valid application, they must within the relevant period notify the following that the application is not accepted—
(a) the applicant;
(b) the local planning authority; and
(c) any other persons that the Welsh Ministers consider appropriate.
(6) Notification given under paragraph (5) must include the reasons why the Welsh Ministers consider that the application received is not a valid application.
(7) In this article, “the relevant period” (“y cyfnod perthnasol”) is—
(a) in a case where the application is accompanied by an environmental statement, 42 days, beginning with the day on which the Welsh Ministers are in receipt of an application, or such longer period as the Welsh Ministers may determine; or
(b) in a case where the application is not accompanied by an environmental statement, 28 days, beginning with the day on which the Welsh Ministers are in receipt of an application, or such longer period as the Welsh Ministers may determine.
Notices of applications for planning permission
16.—(1) Subject to paragraph (2), an applicant must give requisite notice of the application to any person (other than the applicant) who on the prescribed date is an owner of any of the land to which the application relates, or a tenant—
(a) by serving the notice on every such person whose name and address is known to the applicant; and
(b) where the applicant has taken reasonable steps to ascertain the names and addresses of every such person, but has been unable to do so, by publication of the notice after the prescribed date in a newspaper circulating in the locality in which the land to which the application relates is situated.
(a) by serving the notice on every such person whom the applicant knows to be such a person and whose name and address is known to the applicant;
(b) by publication of the notice after the prescribed date in a newspaper circulating in the locality in which the land to which the application relates is situated; and
(c) by site display in at least one place in every community within which there is situated any part of the land to which the application relates, leaving the notice in position for not less than 7 days in the period of 21 days immediately preceding the making of the application to the Welsh Ministers.
(3) The notice required by paragraph (2)(c) must (in addition to any other matters required to be contained in it) state the address of the website where a copy of the application, and of all plans and other documents submitted with it, will be published.
(5) The date prescribed for the purposes of section 65(2) of the 1990 Act (notice etc of applications for planning permission), and the “prescribed date” (“dyddiad rhagnodedig”) for the purposes of this article, is the day 21 days before the date of the application.
(6) The applications prescribed for the purposes of paragraph (c) of the definition of “owner” (“perchennog”) in section 65(8) of the 1990 Act are minerals applications, and the minerals prescribed for the purposes of that paragraph are any minerals other than oil, gas, coal, gold or silver.
(7) In this article—
“minerals application” (“cais mwynau”) means an application for development consisting of the winning and working of minerals;
“requisite notice” (“hysbysiad gofynnol”) means notice in the appropriate form set out in Schedule 3 (or in a form substantially to the like effect), but will not include notice served using electronic communications; and
“tenant” (“tenant”) means an agricultural tenant as defined in section 65(8) of the 1990 Act, of land any part of which is comprised in the land to which an application relates.
Certificates in relation to notices of applications
17.—(1) Where an application is made, the applicant must certify, in a form published by the Welsh Ministers (or in a form substantially to the like effect), that the requirements of article 16 have been satisfied.
(2) If an applicant has cause to rely on paragraph (5) of article 16, the certificate must state the relevant circumstances.
Publicity for applications for planning permission: Welsh Ministers
18.—(1) An application must be publicised by the Welsh Ministers in the manner prescribed by this article.
(2) An application must be publicised by giving requisite notice—
(a) by publication, within the relevant period, of the notice in a newspaper circulating in the locality in which the land to which the application relates is situated;
(b) by serving the notice, within the relevant period, on any adjoining owner or occupier.
(3) The following information must be published on a website maintained by the Welsh Ministers—
(a) the address and location of the proposed development;
(b) a description of the proposed development;
(c) the date by which any representations about the application must be received;
(d) where and when the application may be inspected; and
(e) how representations may be made about the application.
(4) In this article—
“adjoining owner or occupier” (“perchennog neu feddianydd cyffiniol”) means an owner or occupier of any land adjoining the land to which the application relates;
“the relevant period” (“y cyfnod perthnasol”) means 5 working days, beginning with the day on which the Welsh Ministers accept the application in accordance with article 15(3); and
“requisite notice” (“hysbysiad gofynnol”) means notice in the appropriate form set out in Schedule 4 (or in a form substantially to the like effect).
Publicity for applications for planning permission: local planning authority
19.—(1) An application must be publicised by the local planning authority in the manner prescribed by this article.
(3) Where the local planning authority has satisfied the requirement in paragraph (2), they must inform the Welsh Ministers in writing that they have done so within 5 working days, beginning with the day on which the notice is given.
(4) Where the local planning authority fails to comply with the requirement in paragraph (2), the Welsh Ministers may take the steps required of the authority by that paragraph in place of the authority.
(5) Where the notice is, without any fault or intention of the local planning authority (or the Welsh Ministers, as the case may be in accordance with paragraph (4)), removed, obscured or defaced before the period of 21 days referred to in paragraph (2) has elapsed, they will be treated as having complied with the requirements of that paragraph if they have taken reasonable steps to protect the notice and, if need be, replace it.
Register of applications
20.—(1) The local planning authority must within the relevant period place onthe register required to be kept under article 29 of the 2012 Order a copy of—
(a) any application made to the Welsh Ministers;
(b) any notification of receipt of an application given by the Welsh Ministers under article 12(7);
(c) any notice of acceptance given by the Welsh Ministers in relation to an application under article 15(2);
(d) any notification that an application is not accepted so given under article 15(5);
(e) any written notice of a decision given in relation to an application under article 29; and
(f) any revised notice of a decision to grant planning permission given under article 30.
(2) In this article, “the relevant period” (“y cyfnod perthnasol”) is 5 working days, beginning with—
(a) in a case where an application, notification or notice of the kind referred to in paragraph (1)(a) to (e) is made or given, the day on which the local planning authority receives the application, notification or notice; or
(b) in a case where a notice referred to in paragraph (1)(f) is given, the day on which the local planning authority gives such notice.
Representations received by the local planning authority in respect of applications
PART 4
Consultations before the grant of permission
Duty to consult before the grant of permission
22.—(1) The Welsh Ministers must, within the representation period, consult any specialist consultee, except where a specialist consultee has advised the Welsh Ministers that it does not wish to be consulted.
(2) The exception in paragraph (1) does not apply where, in the opinion of the Welsh Ministers, development falls within paragraph (t) of the Table in Schedule 5.
(3) The Welsh Ministers may in any case or class of case also consult any authority, body or person in addition to those specified in Schedule 5.
(4) Where, by or under this article, the Welsh Ministers are required to consult any specialist consultee before granting planning permission—
(a) they must give notice of the application to the specialist consultee; and
(b) they must not determine the application until at least 21 days after the date on which the notice is given under sub-paragraph (a).
(5) The Welsh Ministers must in determining the application take into account any representations received from a specialist consultee.
Duty to respond to consultation
23.—(1) The requirement to consult in article 22(1) and (2) is prescribed for the purposes of section 54(2)(b) of the 2004 Act (duty to respond to consultation).
(2) For the purposes of section 54(4)(a) of the 2004 Act the period prescribed is—
(a) 21 days, beginning with the earlier of—
(i) the day on which notice referred to in article 22(4)(a) is given; or
(ii) the date of service of a copy of the application on the specialist consultee; or
(b) such other period as may be agreed in writing between the specialist consultee and the Welsh Ministers.
(3) For the purposes of this article and pursuant to section 54(5)(c) of the 2004 Act, a substantive response is one which—
(a) where no consultation for the purposes of section 61Z of the 1990 Act has taken place, or the specialist consultee has failed to give a response in accordance with article 10—
(i) states that the specialist consultee has no comment to make;
(ii) states that the specialist consultee has no objection to the proposed development and refers the Welsh Ministers to current standing advice by the specialist consultee on the subject of the consultation;
(iii) advises the Welsh Ministers of any concerns identified in relation to the proposed development and how those concerns can be addressed by the applicant;
(iv) advises that the specialist consultee objects to the proposed development and sets out the reasons for the objection; or
(b) where consultation for the purposes of section 61Z of the 1990 Act has taken place and the specialist consultee has given a response in accordance with article 10—
(i) states that the specialist consultee has no further comment to make in respect of the proposed development and confirms that any comments made under article 10 remain relevant;
(ii) advises the Welsh Ministers of any new concerns identified in relation to the proposed development, why the concerns were not identified in the response given in accordance with article 10 and—
(aa) how concerns can be addressed by the applicant; or
(bb) that the specialist consultee objects to the proposed development and sets out the reasons for the objection.
Duty to respond to consultation: annual reports
24.—(1) Each specialist consultee which is, by virtue of section 54 of the 2004 Act and article 23, under a duty to respond to consultation must give to the Welsh Ministers, not later than 1 July in each year, beginning with the 1 July 2017, a report as to that specialist consultee’s compliance with section 54(4) of the 2004 Act.
(2) Each specialist consultee which is, by virtue of article 10 under a duty to respond to pre-application consultation must, in the report given to the Welsh Ministers in accordance with paragraph (1), include a report as to the specialist consultee’s compliance with that article.
(3) The report must relate to the period of 12 months commencing on 1 April in the preceding year (“the report year”).
(4) The report must contain, in respect of any report year, a statement as to—
(a) the number of occasions on which the specialist consultee was consulted;
(b) the number of occasions on which a substantive response was provided;
(c) when the substantive response was provided; and
(d) the number of occasions on which the specialist consultee gave—
(i) a substantive response outside the period prescribed for the purposes of section 54(4) of the 2004 Act or, as the case may be, the period specified in or referred to in article 10(1); and
(ii) a summary of the reasons why.
(5) In this article “substantive response” (“ymateb o sylwedd”) means either a substantive response to the applicant or a substantive response to the Welsh Ministers or both in accordance with articles 10 and 23.
PART 5
Reports
Local impact reports
25.—(1) A local impact report required in relation to an application by section 62I(2) and (4) of the 1990 Act (requirement to submit local impact report) must comply with this article.
(2) Such report must—
(a) include a description of—
(i) the relevant planning history of the land to which the application relates;
(ii) any local designations relevant to the land to which the application relates;
(iii) the likely impact of any application in relation to a secondary consent (whether made to, or referred to, the Welsh Ministers under section 62F of the 1990 Act) being granted;
(b) specify any—
(i) locally applicable planning policies, guidance and other documents relevant to the application; and
(ii) draft conditions or obligations to which the relevant local planning authority([27]) considers the application should be subject, if it were granted, which would mitigate any likely impacts of the proposed development on the area (or part of the area) of the authority; and
(i) a copy of the notice required to be displayed under article 19(2);
(ii) a photograph of the notice on display; and
(iii) a description of the location of the notice by reference to a map.
(3) The step taken by the Welsh Ministers for the purposes of section 62I of the 1990 Act is giving notice of acceptance in accordance with article 15(3).
Voluntary local impact reports
26.—(1) Any community council, or local planning authority, submitting a voluntary local impact report under section 62J(2) of the 1990 Act (duty to have regard to local impact report) must do so within the representation period.
(2) Such report must—
(a) include a description of the likely impact of any application in relation to a secondary consent (whether made to, or referred to, the Welsh Ministers under section 62F of the 1990 Act) being granted; and
(b) specify any—
(i) locally applicable planning policies, guidance and other documents relevant to the application; and
(ii) draft conditions or obligations to which the authority or council consider the application, if granted, should be subject for the purpose of mitigating any likely impacts of the proposed development on the area (or part of the area) of the council or authority.
PART 6
Variation of applications
Procedure in respect of variation of applications
27.—(1) Subject to the following provisions of this article, an application may, with the agreement of the Welsh Ministers, be varied after it is made.
(2) An applicant may only propose the variation of a particular application to the Welsh Ministers on one occasion.
(3) An applicant proposing variation of an application must notify the Welsh Ministers in writing within the 10 working days which follow the expiry of the representation period.
(4) Such notification (“notification of intention to vary”) (“hysbysiad o fwriad i amrywio”) must—
(a) be given on a form published by the Welsh Ministers (or a form substantially to the like effect);
(b) provide a description of the variation that the applicant wishes the Welsh Ministers to accept for their consideration; and
(c) be accompanied by any fee required to be paid in relation to the giving of such notification.
(5) The Welsh Ministers must, within 5 working days of receipt of notification of intention to vary given in accordance with paragraph (4), give notice to the applicant indicating whether the Welsh Ministers will accept the proposed variation for the purpose of considering whether or not they agree to the variation.
(6) Where the Welsh Ministers give notice under paragraph (5) which confirms that they will not accept the proposed variation for the purposes of considering whether or not they agree to the variation, it is the application as originally made under article 12 that falls to be determined by the Welsh Ministers.
(7) Where the Welsh Ministers give notice under paragraph (5) which confirms that they will accept the proposed variation for the purposes of considering whether or not they agree to the proposed variation, the applicant must formally submit the proposed variation to the Welsh Ministers within 28 days, beginning with the day on which the notice is given.
(8) Where the Welsh Ministers consider the proposed variation to be such that there is a substantial change in the nature of the development for which planning permission is sought, they must not agree to the variation.
(9) The Welsh Ministers may consult on any variation proposed by an applicant with such persons, and in such manner, as they consider appropriate.
(10) The Welsh Ministers may, when an application is varied under this article, give such notice of the variation as they consider appropriate.
PART 7
Determination and notification of initiation of development
Representations to be taken into account
28.—(1) The Welsh Ministers must, in determining an application, take into account any representation made in response to—
(a) notice given by site display under article 16 or 19;
(b) notice served on—
(i) an owner of the land or tenant under article 16; or
(ii) an adjoining owner or occupier under article 18;
(c) notice or information published in a newspaper under article 16 or 18 or on a website under article 18.
(2) The requirement in paragraph (1) applies only where the representations in question are received during the representation period.
(3) The Welsh Ministers may disregard any representation made after the expiry of the representation period.
(4) The representations and periods referred to in this article are representations and periods prescribed for the purposes of section 71(2)(a) of the 1990 Act (consultations in connection with determinations under section 70).
Written notice of decision relating to an application
29.—(1) Subject to paragraph (2), where the Welsh Ministers accept an application in accordance with article 15, they must give the applicant and local planning authority notice of their decision.
(2) Paragraph (1) does not apply in a case where an application is withdrawn or deemed to be withdrawn([28]).
(3) When the Welsh Ministers give notice of a decision on an application and planning permission is either granted subject to conditions or the application is refused, the notice must state clearly and precisely the full reasons for the refusal or for any condition imposed specifying all policies and proposals in the development plan which are relevant to the decision.
(4) Where—
(a) the applicant has submitted an environmental statement; and
(b) the Welsh Ministers have decided (having taken environmental information into consideration) to grant permission (whether unconditionally or subject to conditions),
the notice given to the applicant in accordance with this article must include a statement that environmental information has been taken into consideration by the Welsh Ministers.
(5) In this article, “environmental information” (“gwybodaeth amgylcheddol”) has the meaning given in regulation 2(1) of the EIA Regulations.
Revised notice of decision to grant planning permission
30.—(1) The person specified for the purposes of section 71ZA(5) of the 1990 Act (decision notices) is the applicant.
(2) For the purposes of section 71ZA(6) the details to be included in the revised version of the notice of a decision to grant planning permission are—
(a) the reference number;
(b) the date and effect of the decision;
(c) the name of the body that made the decision; and
(d) the revision number.
Notification of initiation of development and display of notice
31.—(1) A planning permission for development of national significance is specified for the purposes of section 71ZB(6) of the 1990 Act.
(a) be in the form set out in Schedule 7 (or in a form substantially to the like effect);
(b) be firmly affixed and displayed in a prominent place at or near the place where the development is being carried out;
(c) be legible and easily visible to the public without having to enter the site; and
(d) be printed on durable material.
(4) Where the notice to be displayed is, without any fault or intention of the person carrying out development, removed, obscured or defaced, the person will be treated as having complied with the requirements of sub-paragraphs (b) and (c) of paragraph (3) if they have taken reasonable steps to protect the notice and, if need be, replace it.
PART 8
Amendment to 2012 Order
Amendment to the 2012 Order
32.—(1) The 2012 Order is amended as follows.
(2) After article 1(3) insert—
(4) Nothing in this Order, except for articles 29 and 30, applies where—
(a) an application is made to the Welsh Ministers under section 62D of the 1990 Act (developments of national significance: applications to be made to the Welsh Ministers); or
(b) such an application is proposed to be made.
Carl Sargeant
Minister for Natural Resources, one of the Welsh Ministers
27 January 2016
|
SCHEDULE 1 Articles 8 and 9(5) Publicity and consultation before applying for planning permission
|
|
|
SCHEDULE 2 Article 9(5) Consultation before applying for planning permission
|
SCHEDULE 3 Article 16
Notices under Article 16
|
The Developments of National Significance (Procedure) (Wales) Order 2016
NOTICE UNDER ARTICLE 16(1) OF APPLICATION FOR PLANNING PERMISSION FOR DEVELOPMENT OF NATIONAL SIGNIFICANCE
(to be served on an owner* or a tenant** or to be published in a newspaper (and on a website maintained by the Welsh Ministers))
Proposed development at (a) ………………………………….
I give notice that (b) …………………………………………
is applying to the Welsh Ministers for planning permission in respect of Development of National Significance, which is (c): …………………..
Members of the public may inspect copies of:
- the application;
- the plans; and
- other documents submitted with it
online at (d) ………………………………………………….
Anyone who wishes to make representations about this application should write to the Welsh Ministers at
(e) ……………………………………………. or (f) ……………………………………………………
by (g) ………………………………………………..
* “owner” means a person having a freehold interest or a leasehold interest the unexpired term of which is not less than seven years, or, in the case of development consisting of the winning or working of minerals, a person entitled to an interest in a mineral in the land (other than oil, gas, coal, gold or silver).
** “tenant” means an agricultural tenant, as defined in section 65(8) of the Town and Country Planning Act 1990, of any land any part of which is comprised in the land to which the application relates.
Signed: …………………………………
+ On behalf of: ………………………………
Date: ………………………………………
Statement of owners’ rights
The grant of planning permission does not affect owners’ rights to retain or dispose of their property, unless there is some provision to the contrary in an agreement or in a lease.
Statement of agricultural tenants’ rights
The grant of planning permission for non-agricultural development may affect agricultural tenants’ security of tenure.
+ delete where inappropriate
________________________________________________________________________________
Insert:
a) address or location of the proposed development b) applicant’s name c) description of the proposed development d) address of website maintained by the Welsh Ministers (url) e) email address of the Welsh Ministers f) address of the Welsh Ministers g) date giving a notice period of 21 days, beginning with the date of service, or 14 days beginning with the date of publication, of the notice (as the case may be)
The Developments of National Significance (Procedure) (Wales) Order 2016
NOTICE UNDER ARTICLE 16(2) OF APPLICATION FOR PLANNING PERMISSION FOR DEVELOPMENT OF NATIONAL SIGNIFICANCE CONSISTING OF THE WINNING AND WORKING OF MINERALS BY UNDERGROUND OPERATIONS
(to be posted in the case of an application for planning permission in respect of Development of National Significance consisting of the winning and working of minerals by underground operations (in addition to the service or publication of any other requisite notice in this Schedule)).
Proposed development at (a) …………………………………………….
I give notice that (b) ………………………………………………….. .
is applying to the Welsh Ministers for planning permission in respect of Development of National Significance which is (c): ………………………………………………..
Members of the public may inspect copies of:
- the application;
- the plans; and
- other documents submitted with it
online at (d) ………………………………………………………………
Anyone who wishes to make representations about this application should write to the Welsh Ministers at (e) ……………………………………………or (f) ..................................................................
by (g) …………………………………………
Signed: ………………………………………
+ On behalf of: ………………………………..
Date: …………………………………………..
+ delete where inappropriate
_________________________________________________________________________________
Insert:
a) address or location of the proposed development b) applicant’s name c) description of the proposed development d) address of website maintained by the Welsh Ministers (url) e) email address of the Welsh Ministers f) address of the Welsh Ministers g) date giving a period of 21 days, beginning with the date when the notice is posted
|
SCHEDULE 4 Article 18
Publicity for applications
|
The Developments of National Significance (Procedure) (Wales) Order 2016
NOTICE UNDER ARTICLE 18 OF APPLICATION FOR PLANNING PERMISSION IN RESPECT OF DEVELOPMENT OF NATIONAL SIGNIFICANCE
(to be served on owners and/or occupiers of adjoining land; published on a website maintained by the Welsh Ministers; and published in a newspaper)
Proposed development at (a) ………………………………………………..
I give notice that (b) ………………………………………………………….
is applying to the Welsh Ministers for planning permission in respect of Development of National Significance which is (c): ………………………….
Members of the public may inspect copies of:
- the application;
- the plans; and
- other documents submitted with it
at (d) ……………………………………………………………………………..
during all reasonable hours until (e) ………………………………………….
and, online at (f) ………………………………………………………………….
+The application is accompanied by an Environmental Statement
Members of the public may obtain copies of the Environmental Statement from (g)
………………………………………………………… for a charge, so long as stocks last.
Anyone who wishes to make representations about this application must write to the Welsh Ministers at (h) ………………………………………………………; or
(i) ………………………………………………………..
by (j) …………………………………………………
Signed: ………………………………………………
On behalf of ………………………………………….
Date: …………………………………
+ delete where inappropriate
Insert:
a) address or location of the proposed development b) applicant’s name c) description of the proposed development d) address of the local planning authority e) date giving a period of 21 days, beginning with the date of service and publication f) address of website maintained by the Welsh Ministers (url) g) address of the applicant h) email address of the Welsh Ministers i) address of the Welsh Ministers j) date giving a period of 21 days, beginning with the date of service and publication
|
SCHEDULE 5 Article 22
Duty to consult before the grant of permission
|
Table |
|
|
|
|
Paragraph |
Description of Development |
Specialist Consultee |
|
|
|
|
|
|
|
(a) |
Development within an area which has
been notified to the Welsh Ministers by the Health and Safety
Executive for the purpose of this provision because of the presence
within the vicinity of toxic, highly reactive, explosive or
inflammable substances (otherwise than on a relevant nuclear site)
and which involves the provision of— |
The Health and Safety Executive |
|
|
(b) |
Development within an area which has
been notified to the Welsh Ministers by the Office for Nuclear
Regulation for the purpose of this provision because of the
presence within the vicinity of toxic, highly reactive, explosive
or inflammable substances on a relevant nuclear site and which
involves the provision of— |
The Office for Nuclear Regulation |
|
|
(c) |
Development likely to result in a material increase in the volume or a material change in the character of traffic— |
|
|
|
|
(i) entering or leaving a trunk road; or |
The Welsh Ministers |
|
|
|
(ii) using a level crossing over a railway |
The operator of the network which includes or consists of the railway in question, and the Welsh Ministers |
|
|
(d) |
Development likely to result in a material increase in the volume or a material change in the character of traffic entering or leaving a classified road or proposed highway |
The local highway authority concerned |
|
|
(e) |
Development likely to prejudice the improvement or construction of a classified road or proposed highway |
The local highway authority concerned |
|
|
(f) |
Development which involves the provision of a building or pipe-line in an area of coal working notified by the Coal Authority to the Welsh Ministers |
The Coal Authority |
|
|
(g) |
Development involving or including mining operations |
The Natural Resources Body for Wales |
|
|
(h) |
Development likely to affect the site of a scheduled monument |
The Welsh Ministers |
|
|
(i) |
Development involving the carrying out of works or operations in the bed of or on the banks of a river or stream |
The Natural Resources Body for Wales |
|
|
(j) |
Development for the purpose of refining or storing mineral oils and their derivatives |
The Natural Resources Body for Wales |
|
|
(k) |
Development involving the use of land for the deposit of refuse or waste |
The Natural Resources Body for Wales |
|
|
(l) |
Development relating to the retention, treatment or disposal of sewage, trade-waste, slurry or sludge (other than the laying of sewers, the construction of pumphouses in a line of sewers, the construction of septic tanks and cesspools serving single dwellinghouses or single caravans or single buildings in which not more than ten people will normally reside, work or congregate, and works ancillary thereto) |
The Natural Resources Body for Wales |
|
|
(m) |
Development affecting the use of land as a cemetery |
The Natural Resources Body for Wales |
|
|
(n) |
Development— of which notification has been given, or has effect as if given, to the Welsh Ministers by the Natural Resources Body for Wales, in accordance with section 28 of the Wildlife and Countryside Act 1981 (sites of special scientific interest)([29]) |
The Natural Resources Body for Wales |
|
|
(o) |
Development involving any land on which there is a theatre
|
The Theatres Trust |
|
|
(p) |
Development which is not for
agricultural purposes, is not in accordance with the provisions of
a development plan and involves— |
The Welsh Ministers |
|
|
(q) |
Development within 250 metres of
land which— |
The Natural Resources Body for Wales |
|
|
(r) |
Development which— |
The Sports Council for Wales([30]) |
|
|
(s) |
Development likely to
affect— |
The Canal & River Trust |
|
|
(t) |
Development— (i) involving the siting of new establishments; (ii) consisting of modifications to existing establishments covered by Article 11 of Directive 2012/18/EU([31]); or (iii) which is new, including transport routes, locations of public use and residential areas in the vicinity of existing establishments, where the siting or development may be the source of or increase the risk or consequences of a major accident |
(a) The control of major accident hazards competent authority; and (b) in relation to development falling within paragraph (iii), any person who is the person in control of the land on which any existing establishment in question is located either— (i) according to the register held by the hazardous substances authority under regulation 22 of the Planning (Hazardous Substances) (Wales) Regulations 2015([32]); or (ii) where the control of major accident hazards competent authority has notified the local planning authority pursuant to regulation 34(3) of those Regulations. |
|
Interpretation of Table
In the above Table—
(a) in paragraphs (a) and (b)—
“floor space” (“arwynebedd llawr”) means the total floor space in a building or buildings;
“industrial process” (“proses ddiwydiannol”) means a process for or incidental to any of the following purposes—
(i) the making of any article or part of any article (including a ship or vessel, or a film, video or sound recording);
(ii) the altering, repairing, maintaining, ornamenting, finishing, cleaning, washing, packing, canning, adapting for sale, breaking up or demolition of any article; or
(iii) the getting, dressing or treatment of minerals in the course of any trade or business other than agriculture, and other than a process carried out on land used as a mine or adjacent to and occupied together with a mine (and in this sub-paragraph, “mine” (“mwynglawdd”) means any site on which mining operations are carried out);
“relevant nuclear site” (“safle niwclear perthnasol”) means a site which is—
(i) a GB nuclear site (within the meaning given in section 68 of the Energy Act 2013)([33]);
(ii) an authorised defence site (within the meaning given by regulation 2(1) of the Health and Safety (Enforcing Authority) Regulations 1998([34])); or
(iii) a new nuclear build site (within the meaning given by regulation 2A(1) those Regulations)([35]).
(b) in paragraph (c), “network” (“rhwydwaith”) and “operator” (“gweithredwr”) have the same meaning as in section 83(1) of the Railways Act 1993 (the provision of railway services)([36]);
(c) in paragraphs (d) and (e), “classified road” (“ffordd ddosbarthiadol”) means a highway or proposed highway which—
(i) is a classified road or a principal road by virtue of section 12(1) of the Highways Act 1980 (general provision as to principal and classified roads)([37]); or
(ii) is classified for the purposes of any enactment by the Welsh Ministers by virtue of section 12(3) of that Act;
(d) in paragraph (h), “scheduled monument” (“heneb gofrestredig”) has the same meaning as in section 1(11) of the Ancient Monuments and Archaeological Areas Act 1979 (schedule of monuments)([38]);
(e) in paragraph (l)—
“dwellinghouse” (“ty annedd”) does not include a building containing one or more flats, or a flat
contained within such a building (and in this paragraph, “flat” (“fflat”) means a separate and self-contained set of premises constructed or adapted for the purpose of dwelling and forming part of a building from some other part of which is divided horizontally);
“slurry” (“slyri”) means animal faeces and urine (whether or not water has been added for handling); and
“caravan” (“carafán”) has the same meaning as in section 29(1) of the Caravan Sites and Control of Development Act 1960 (caravan sites)([39]);
(f) in paragraph (n), “site of special scientific interest” (“safle o ddiddordeb gwyddonol arbennig”) means land to which section 28(1) of the Wildlife and Countryside Act 1981 (sites of special scientific interest) applies;
(g) in paragraph (o), theatre” (“theatr”) has the same meaning as in section 5 of the Theatres Trust Act 1976 (interpretation)([40]);
(h) in paragraph (r)—
(i) “playing field” (“maes chwarae”) means the whole of a site which encompasses at least one playing pitch;
(ii) “playing pitch” (“llain chwarae”) means a delineated area which, together with any run-off area, is of 0.2 hectares or more, and which is used for association football, American football, rugby, cricket, hockey, lacrosse, rounders, baseball, softball, Australian football, Gaelic football, shinty, hurling, polo or cycle polo;
(i) in paragraph (t)—
(i) expressions appearing both in that paragraph and in Directive 2012/18/EU have the same meaning as in that Directive; and
(ii) “control of major accident hazards competent authority” (“awdurdod COMAH cymwys”) means—
(aa) in relation to a relevant nuclear site, the Office of Nuclear Regulation and the Natural Resources Body for Wales, acting jointly;
(bb) otherwise, the Health and Safety Executive and the Natural Resources Body for Wales acting jointly.
SCHEDULE 6 Article 31(2)
Notification of initiation of development and display of notice
|
The Developments of National Significance (Procedure) (Wales) Order 2016
NOTICE UNDER ARTICLE 31(2) TO BE GIVEN TO A LOCAL PLANNING AUTHORITY TO INFORM THEM WHEN DEVELOPMENT WILL BEGIN
Proposed development at (a) ……………………………………………………………...
I (b) …………………………of…………………………………………..
give notice to the (c) ………………………………………………. Local Planning Authority
that the proposed development granted permission under (d) …………………………
on (e) …………………………………………………………………………………………..
will begin on (f) …………………………………………………………………………
Description of the proposed development: (g)
…………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………
I confirm I am+ the owner of the land to which the proposed development relates*
I confirm I am not+ the owner of the land to which the proposed development relates and the owner’s full name and address are:*
(h) ………………………………………………………………………………………………
(i) ………………………………………………………………………………………………
Site manager name: (j)……………………………………………………………………….
Site manager contact information: (k)…………………………………………………….
………………………………………………………….
………………………………………………………….
…………………………………………………………. I confirm that the following pre-commencement conditions have been complied with (l):
Permission reference……………….Condition number:…………Date agreed……….
Permission reference……………….Condition number:…………Date agreed……….
Permission reference……………….Condition number:…………Date agreed……….
Permission reference……………….Condition number:…………Date agreed……….
Permission reference……………….Condition number:…………Date agreed……….
Permission reference……………….Condition number:…………Date agreed……….
Permission reference……………….Condition number:…………Date agreed……….
Permission reference……………….Condition number:…………Date agreed……….
If required, please continue on a separate sheet
I attach a plan which indicates:
- A red line around the site boundary of the land that benefits from the permission - The location where the notice, required by section 71ZB(2) of the Town and Country Planning Act 1990, will be displayed.
Before beginning any development related to a grant of planning permission for development of national significance a person must give notice to the local planning authority on this form.
A person carrying out development related to a grant of planning permission for development of national significance must complete the form in Schedule 7 to the Developments of National Significance (Procedure) (Wales) Order 2016 and display that form at or near the place where development is being carried out, at all times when development is being carried out. That form must be displayed in accordance with article 31(3) of the Developments of National Significance (Procedure) (Wales) Order 2016.
Signed …………………………………………………………..
Date……………………………………………………………….
+ relates to the applicant identified at (b) * delete where appropriate
Insert:
a) address or location of the proposed development b) applicant’s name and address c) name of the local planning authority d) planning application reference number e) date the decision notice was issued f) date the development is to begin g) description of development as included on the decision notice h) owner’s full name (if applicable) i) owner’s full address (if applicable) j) name of the person who has or will be appointed to oversee the carrying out of the development on site k) contact details for person (j) including, where appropriate, business postal and email addresses and telephone number l) pre-commencement conditions are those that require the approval of details by the local planning authority before the development can commence |
|
|
|
SCHEDULE 7 Article 31(3) Notice to be displayed at all times when development is being carried out
|
|
The Developments of National Significance (Procedure) (Wales) Order 2016
NOTICE UNDER ARTICLE 31(3)TO BE DISPLAYED AT ALL TIMES WHEN DEVELOPMENT IS BEING CARRIED OUT PART 1 Development at (a)…….……………………………………………………………………………….. Notice is hereby given that planning permission (b)…………………………………………………… was granted subject to conditions (c) to (d)…………..………………………………………………… on (e)……...…………………………………………………………………………………………….. by (f)…….…………………………………………………….and development has now commenced. The development comprises (g)……..…………………………………………………………………….. and is marked by the edged/coloured area of the attached plan which is drawn to an identified scale and which forms, and is displayed as, PART 2 of this notice. Further information regarding the planning permission including the conditions, if any, on which it has been granted can be obtained at all reasonable hours at (h)……...…………………………………………. A person carrying out development related to a grant of planning permission for development of national significance must display this form at or near the place where development is being carried out, at all times when development is being carried out. The form must be displayed in accordance with article 31(3) of the Developments of National Significance (Procedure) (Wales) Order 2016. Before beginning development related to a grant of planning permission for development of national significance a person must give notice to the local planning authority on the form in Schedule 6 to the Developments of National Significance (Procedure) (Wales) Order 2016.
|
|
Notes a) Insert address or describe the location of development. b) Insert the relevant planning application reference number. c) Delete “subject to conditions” if the planning permission is not subject to any conditions. d) Insert name and address of developer. e) Insert date on which planning permission granted. f) Insert planning authority or Welsh Ministers. g) Insert description of development. h) Insert address of local planning authority. |
([1]) See section 62D(3) of the Town and Country Planning Act 1990 (c. 8) and the Developments of National Significance (Specified Criteria and Prescribed Secondary Consents) (Wales) Regulations 2016 (S.I. 2016/53) (W.25) (“Specified Criteria and Prescribed Secondary Consents Regulations”).
([3]) 1990 c. 8; Section 59 was amended by section 27 of, and paragraph 3 of Schedule 4 to, and section 55 of, and paragraph 5 of Schedule 7 to, the Planning (Wales) Act 2015 (anaw. 4) (“the 2015 Act”). There are other amendments which are not relevant to this instrument.
([4]) The functions of the Secretary of State were transferred to the National Assembly for Wales by article 2 of the National Assembly for Wales (Transfer of Functions) Order 1999 (S.I. 1999/672); see the entry in Schedule 1for the Town and Country Planning Act 1990 (“the 1990 Act”). The functions of the National Assembly for Wales were transferred to the Welsh Ministers by virtue of section 162 of, and paragraphs 30 and 32 of Schedule 11 to, the Government of Wales Act 2006 (c. 32).
([5]) Section 62 was substituted by section 42(1) of the Planning and Compulsory Purchase Act 2004 (c. 5) (“the 2004 Act”), amended by section 17 of the 2015 Act and applied with modifications by article 3(1) of the Developments of National Significance (Application of Enactments) (Wales) Order 2016 (S.I. 2016/54) (W. 24) (“the Application of Enactments Order”). Section 65 was substituted by section 16(1) of the Planning and Compensation Act 1991 (c. 34) (“the 1991 Act”), amended by section 40 of, and paragraph 35 of the Schedule to, the Agricultural Tenancies Act 1995 (c. 8) and applied with modifications by article 3(1) of the Application of Enactments Order. Section 69 was substituted by section 118 of, and paragraphs 1 and 3 of Schedule 6 to, the 2004 Act and amended by section 190(4)(b) and (c) of the Planning Act 2008 (c. 29) (“the 2008 Act”) and section 237 of, and Part 18 of Schedule 25 to, the Localism Act 2011 (c. 20); (see section 69(9) for the definition of “prescribed”). Section 71 was amended by section 16(2) of, and paragraph 15 of Schedule 7 to, the 1991 Act (see section 71(4) for the definition of “prescribed”) and section 58(1) of, and paragraph 6 of Schedule 4 to, the Mobile Homes (Wales) Act 2013 (anaw. 6) and was applied with modifications by article 3(1) of the Application of Enactments Order. There are other amendments to these sections which are not relevant to this instrument.
([7]) Section 61Z was inserted by section 17(3) of the 2015 Act. Section 62E was inserted by section 19 of the 2015 Act. Sections 62I, 62J and 62K were inserted by section 21 of the 2015 Act. Section 62L was inserted by section 22 of the 2015 Act. Section 62R was inserted by section 25 of the 2015 Act. Section 71ZA was inserted by section 33 of the 2015 Act. Section 71ZB was inserted by section 34 of the 2015 Act. Section 333 was amended by section 78 of, and paragraph 32(12) of Schedule 10 to, the Environment Act 1995 (c. 25), section 118(1) of, and paragraphs 1 and 4 of Schedule 6 to, the 2004 Act, S.I. 2014/2773 (W. 280) and section 55 of, and paragraphs 3 and 6 of Schedule 7 to, the 2015 Act.
([9]) The functions of the National Assembly for Wales were transferred to the Welsh Ministers by virtue of section 162 of, and paragraphs 30 and 32 of Schedule 11 to, the Government of Wales Act 2006 (c. 32).
([11]) “Special development order” (“gorchymyn datblygu arbennig”) means an order under section 59(3)(b) of the1990 Act.
([15]) 2000 c. 7; section 15(1) was amended by section 406(1) of, and paragraph 158 of Schedule 17 to, the Communications Act 2003 (c. 21).
([16]) For the definition of “development” (“datblygiad”) see section 55 of the 1990 Act. See also regulation 56 of the Town and Country Planning (Environmental Impact Assessment) (Wales) Regulations 2016 (S.I. 2016/58) (W. 28).
([17]) See section 62D(3) of the 1990 Act and the Specified Criteria and Prescribed Secondary Consents Regulations.
([18]) Section 62(3) was applied with modifications by article 3(1) of the Application of Enactments Order.
([19]) For the definition of “secondary consent” (“cydsyniad eilaidd”) see section 62H of the 1990 Act. Section 62H was inserted by section 20 of the 2015 Act. Secondary consents are prescribed for the purposes of section 62H(1) by the Specified Criteria and Prescribed Secondary Consents Regulations.
([21]) See section 62G(2) of the 1990 Act for the meaning of “relevant person” (“person perthnasol”). Section 62G was inserted by section 20 of the 2015 Act.
([22]) Section 73 was amended by sections 42(2), 51(3), 120 of, and Schedule 9 to, the 2004 Act and section 35(7) of the 2015 Act and was applied with modifications by article 3(1) of the Application of Enactments Order. Applications made pursuant to section 73 which are to be treated as nationally significant development in accordance with section 62D(6) of the 1990 Act, are those of a description specified in regulation 51 of the Developments of National Significance (Wales) Regulations 2016 (S.I. 2016/56) (W. 26).
([23]) Section 106 was substituted by section 12(1) of the 1991 Act and amended by section 174(2) of the 2008 Act and section 7 of, paragraph 3 of Schedule 2 to, the Growth and Infrastructure Act 2013 (c. 27).
([27]) See section 62I(5) of the 1990 Act for the meaning of “relevant local planning authority” (“awdurdod cynllunio lleol perthnasol”) for the purposes of section 62I(2).
([28]) See regulations 10(9) and 12(8) of the Developments of National Significance (Fees) (Wales) Regulations 2016 (S.I. 2016/57) (W.27) in respect of the deemed withdrawal of applications.
([29]) 1981 (c. 69); see section 27AA of that Act. Section 28 was substituted by section 75(1) of, and paragraph 1 of Schedule 9 to, the Countryside and Rights of Way Act 2000 (c. 37) and was amended by section 148 of, and paragraphs 2(2), (3) and (7) of Schedule 13 to, the Marine and Coastal Access Act 2009 (c. 23). There are other amendments which are not relevant to this instrument.
([34]) S.I. 1998/494. The definition of “authorised defence site” was inserted by article 6(2) of, and paragraphs 70 and 72(a) of Schedule 3 to, the Energy Act 2013 (Office for Nuclear Regulation) (Consequential Amendments, Transitional Provisions and Savings) Order 2014 (S.I. 2014/469).